Start-up of Berlin International Airport

Led by DFS (2017 - 2018)

Prepare the operational crews of TXL and SXF tower and ACC Bremen for the new airport operation. The technical equipment in the tower is availbale since 2012 and has to be adapted to fit to the changed conditions (e.g. airport layout) in 2018. P1 / ATCAS, AMAN and PSS Bremen and the ATS system have to be adapted to new routes and the controller have to be trained with regard to the new procedures.

Sites involved

ACC/UAC : Bremen

Project description

Start of operation of new airport in Berlin; adaptation of flight procedures and potential increase of sector capacities. Avoid potential bottlenecks and create re-routing scenarios.

Implementation Steps

Period
StartEndLed by
Training01/201910/2019CC BRE - TWR BER
Start of operation10/2019DFS